Create:Code Review FE Team

The Create:Code Review FE team is responsible for all frontend aspects of the product categories that fall under the Code Review group of the Create stage.
Category Handle
GitLab Team Handle @code-review-fe
Slack Channel #g_create_source-code-review-fe
Slack Handle @code_review_fe
Team Boards Current Milestone
Issue Tracker group::code review + frontend in gitlab-org

Commonly Monitored Issue Lists

Projects

Active Project Table

Start Date Project Description Tech Lead
2019 Merge Requests Vue app The frontend application that renders Merge Requests —
2023-09 New Diffs (Epic) A project to deliver a reusable and performant way of rendering diffs across GitLab —

Engineering Onboarding

Work

See the work section of the main Code Review page.

Capacity planning

These are the broad definition for each of the weights values. We don’t use a Fibonacci-based progression but we do try to split up large issues as we understand they are by definition less accurate predictions.

When issues are Frontend only, we use the Weight feature of Issues.

When issues are both Frontend and Backend we use specific labels to support both weights in the same issue: ~frontend-weight::1 through ~frontend-weight::13. Only weights between 1-3 can be scheduled into a milestone. Higher ones need to be broken down.

Note: Since milestone 13.10, we switched to using a fibonacci based scale. The reason behind this is how hard it’s been to distinguish between issues of weight 3 and 4 or weight 4 and 5. Fibonacci allows for a clearer distinction as weights increase.

Weight Description
1: Trivial The problem is very well understood, no extra investigation is required, the exact solution is already known and just needs to be implemented, no surprises are expected, and no coordination with other teams or people is required.
2: Small The problem is well understood and a solution is outlined, but a little bit of extra investigation will probably still be required to realize the solution.
3: Medium Features that are well understood and relatively straightforward. Bugs that are relatively poorly understood and may not yet have a suggested solution.

Anything above weight 3 is unschedulable.

Those are either large amounts of work or have too many unknowns. In that case, opt to break it down into multiple issues right away or open an epic to start a discussion in order to create the multiple steps.

Also consider adding the label: ~"workflow::planning breakdown".

Why?

This hard limit helps the team embody the Iteration value.

Kickoff & Retrospective Review

On the first week of every milestone, we have a sync-call with every IC in which we review the comments shared in the async retrospective and after that each engineer takes turns at presenting their plan for their Deliverables for the new milestone.

This is scheduled ad-hoc within the first 5-10 days of the milestone.