How we work
Why this exists
We organise work around the contributor flywheel and growth outcomes. This page connects our backlog, planning, and delivery so anyone can understand what we are doing, why, and who owns it. See Reporting and measurement for outcomes, reporting categories, and supporting metrics.
Structure work
Projects and issues
Our team project is the entry point for the team’s tasks and backlog. The issue location depends on the work:
- GitLab product and contribution flow: create public issues that enhance the open source GitLab project in gitlab-org/gitlab by default. Contributors and team members should be able to work on them alike.
- Team operations and coordination: use team-task for internal team workings, onboarding, and customer coordination that belongs separately from the GitLab product project.
- Contributor platform delivery: use contributors-gitlab-com for small, scoped, actionable technical tasks.
Track larger platform initiatives, planning, and coordination in
team-task, linking their implementation issues rather than duplicating the same delivery task. Use a group epic where appropriate to organise the larger work. - Contributor platform alerts: follow observability alert triage.
Alerts are created in
contributors-gitlab-com; keep sensitive details in the confidential alert issue.
Epics and delivery groups
Use epics to group related delivery work and issues to describe concrete deliverables. Group delivery under the relevant flywheel stage or Advocacy epic, using child epics where needed.
- Outside objectives holds cross-cutting work.
- Operations and team efficiency holds operational work. Neither is a funnel stage.
The Customer Growth and Product Growth records define outcomes, not delivery containers.
For a high-effort issue, consider an epic and smaller, independently useful issues rather than one large delivery task. For a high-effort epic, consider child epics, smaller issues, or phased delivery milestones. These are ways to make progress reviewable, not automatic requirements based on an estimate.
Boards and visibility
The contributor flywheel board groups delivery by stage and epic. We aren’t yet using GitLab epic and issue boards, but will consider them (probably grouped by priority or assignee) in the future.
The flywheel board is not a complete cross-project backlog.
Its counting rules include open contributor-success epics and open team-task issues only.
Issues in other projects are excluded even when attached to those epics.
Sign-in and permissions also affect what each viewer sees.
For outcome reporting rather than board placeholders, see Reporting and measurement.
When reporting work outside team-task, link to its issue rather than treating an absent board entry as absent work.
A team-task coordination issue gives a larger platform initiative visibility, but its contributors-gitlab-com implementation issues remain excluded.
Representing all owning-project issues in a cross-project backlog remains an open decision; board coverage does not change the issue-routing rules above.
Assess and prioritise
Validate effort against expected impact on our team strategy before committing to delivery.
Impact and effort
Record impact, effort, and the reasoning in the issue or epic description using plain Low, Medium, or High assessments.
These are starting guidelines to calibrate over time, not the definitions of GitLab-wide Impact:: or Effort:: labels.
Also explain urgency: deadlines, contributor-blocking bugs, and the cost of waiting.
Compare rough estimates during refinement using judgement, not a numeric scoring formula. Use the priority matrix as the default, documenting any exceptions. Split work when a smaller deliverable can test the assumption or remove the blocker. Record the reason for the chosen priority so others can revisit it when evidence changes.
Impact
Every item needs an expected benefit: describe who benefits, the problem or blocker, and the contribution to a growth outcome or supporting indicator. Link evidence, such as contributor feedback or an observed bottleneck, and state confidence and assumptions.
| Assessment | Initial guidance |
|---|---|
| Low | Narrow or local incremental benefit, such as removing friction from a single task. |
| Medium | Removes a recurring blocker, improves a shared workflow, or benefits an identifiable contributor or customer group with a plausible outcome. |
| High | Evidence supports a material improvement to a growth KPI, removal of a significant shared bottleneck, or a strategic reusable capability benefiting many people or a key customer outcome. |
Consider reach, depth of benefit, and reuse together; headcount alone does not determine impact, and customer work is not automatically High. Valuable experiments do not need certainty: if impact is unknown, state the uncertainty and propose a small experiment with a learning goal.
Effort
Estimate total hands-on person-effort, not elapsed calendar time, including design, implementation, testing, review, documentation, coordination, and ongoing burden. Describe the smallest useful deliverable, dependencies, and uncertainty.
| Item type | Low | Medium | High |
|---|---|---|---|
| Issue | A few hours | About one working day | Multiple working days |
| Epic | A few working days | A few working weeks | Longer than a few working weeks |
These bands are rough guides, not exact boundaries or delivery commitments. An epic estimate covers its aggregate delivery scope; do not compare a Low epic directly with a Low issue or count both in a roll-up.
Aim for Low- or Medium-effort actions in contributors-gitlab-com.
For High-effort issues, review splitting and tracking the larger work in team-task, with an epic where useful.
For example, a small UI wording correction might have Low effort and Low impact, while a multi-step onboarding enhancement might need splitting because of High effort.
Assess the enhancement’s impact from its expected benefit and evidence, not its size.
Priority labels
Normally, determine priority from impact and effort using the table below.
| Impact | Low effort | Medium effort | High effort |
|---|---|---|---|
| High | priority::1 |
priority::1 |
priority::2 |
| Medium | priority::1 |
priority::2 |
priority::3 |
| Low | priority::2 |
priority::3 |
priority::4 |
priority::1 is the highest priority; priority::4 is the lowest.
Urgency, dependencies, or strategic commitments can override the default.
Record the rationale for an override in the issue or epic description.
Deliver work
Larger items have a DRI who owns the strategy and reporting, not necessarily every implementation task.
Workflow labels
We are not currently using workflow labels to track our work. In future, we may adopt work item statuses but should avoid legacy workflow labels.
How to pick issues
Select issues by priority.
Focus on priority::1 and priority::2 for the current quarter.
A lower-priority task can fit between larger projects.
Use GitLab’s principles of efficiency and iteration to act as a manager of one when choosing tasks.
Keep the issue’s status, implementation plan, and blockers current as delivery progresses. Use the team stand-up to collaborate on progress and blockers.
Team cadence
Retrospective
The most recent recorded team retrospective covered FY26Q3 and ran asynchronously in November 2025. We have not held regular retrospectives for several quarters. We are reviewing how we work and may resume retrospectives in future.
Stand-up
The purpose of this stand-up is to collaborate between team members. This is a team-specific meeting to check in on blockers, progress and ways to think differently and iterate towards our goals.
Report progress
See Reporting and measurement for how we separate outcomes from delivery activity, classify work, assign reporting ownership, and use supporting metrics and dashboards.
3b39fc6a)
