Core Development Department
Vision
Our goal is not merely to launch features, but to ensure they land successfully and provide real value to our customers. We strive to develop a best-in-class product that exceeds expectations across all user groups by meeting high-quality standards while ensuring reliability and maintaining an ease of operation and scalability to meet diverse customer needs. All team members should remain mindful of our target customers and the multiple platforms we support in everything we do.
Ensure our product excels in all aspects especially for our primary customer organization archetypes of large enterprises. This includes scalability, adaptability, and seamless upgrade paths. When designing and implementing features, always keep in mind compatibility for all our deployment options: self-managed, dedicated and Software as a Service (SaaS).
Develop our technical, diverse and global team to drive results that support our product and customer growth, while maintaining our values and unique way of working.
Mission
GitLab’s unique way of working asynchronously, handbook first method, utilization of the product we develop and clear focus on our values enables very high productivity. We focus on constantly improving quality, usability and reliability of our product to reach maximum customer satisfaction. Community contributions and customer interactions rely on efficient and effective communication. We are a data-driven, customer experience first, open core organization delivering one secure, reliable, world leading DevSecOps platform. Join us in setting new standards, driving innovation, pushing the boundaries of DevSecOps, and consistently delivering exceptional results for our customers.
Be Strategic
To better fulfill our goals and vision, we will shift from a reactive approach to a strategic one. A key initiative to accomplish that will be the development of comprehensive technical roadmaps across all groups to use our 40% time budget efficiently. This approach allows us to concentrate on enhancing our product by aligning technical and architectural improvements across teams, ensuring they are in harmony with our overarching business objectives. We will establish department-wide initiatives and targets, but it is crucial that each group identifies and prioritizes the most critical areas for improvement in their respective area (e.g., reducing technical debt, resolving bugs or optimizing performance). It is also essential that we coordinate between groups to address cross-cutting concerns.
Fostering High-Performing Teams for Efficient Execution
In today’s competitive landscape, GitLab’s success hinges on our ability to build and maintain high-performing teams capable of efficient and rapid execution.
Key Focus Areas
-
Team Optimization
- Enhance communication and leadership within groups
- Implement efficient processes
- Develop situational awareness across teams
- Promote continuous upskilling towards group needs and/or the wider engineering division
-
Streamlined Delivery
- Identify and fix internal and external bottlenecks
- Focus on the swift delivery of results meeting acceptance criteria and general quality bar
- Look out for improvements in efficiency by enhancing the product and using all its capabilities
-
Quad Execution
- Clarify responsibilities within quads
- Encourage accountability amongst team members and counterparts
- Empower quads to execute independently with a clear vision
-
Innovation and Creativity
- Encourage research and ingenuity by defining clear paths for delivering promising ideas
- Tap into the underutilized creative potential within teams
We aim to create an environment where high-performing teams can thrive, innovate and execute efficiently, ultimately driving GitLab’s competitive edge in the market.
Connect the Dots! In the Product and Between Teams
One of our product’s greatest strengths and selling points is its unified platform approach. While we currently offer multiple functionalities within a single product, we should strive to further enhance this advantage by creating stronger connections between these different areas.
To fully leverage this strength, we need to:
- Integrate features more seamlessly across the platform
- Develop cross-functional capabilities that highlight the benefits of our unified approach
- Ensure a consistent user experience throughout the product
- Align and reuse foundational implementations across the whole platform
Additionally, it’s crucial to improve collaboration at the team level especially to support this part of our mission.
We should:
- Increase awareness of ongoing projects and initiatives across teams
- Share knowledge about new technologies and innovations and how they are applied today
- Promote understanding of functionalities in different product areas
- Foster greater collaboration between teams throughout the entire engineering organization
Product with a Customer Focus
We will continue our strong partnership with Product to make GitLab the best, most complete DevSecOps platform on the planet. This coordination and prioritization requires a lot of work and effort to provide the right data and make the right decisions. We will focus on a variety of factors, but top of mind will be our parent department’s direction to be customer focused.
AI Everywhere: Empowering Teams with Artificial Intelligence
The use of AI is not to replace current features or areas but instead to enhance all areas respectively in an impactful way. We are committed to enabling all teams across our product ecosystem to leverage AI features effectively and confidently. Given the unprecedented pace of AI evolution, it’s crucial that every team understands its potential applications for their respective domains (where each team has also the largest amount of knowledge) and current capabilities.
Three AI platform streams will be available this year:
- Feature Integration into Duo Chat
- Model Functionality for Duo Enterprise Features
- Extensions to Duo Workflow
Our goal is also to maximize the usage of our own AI features, particularly in supporting and accelerating common team challenges such as:
- Technical debt reduction
- Dependency updates
- Code review optimization
- Pipeline issue resolution
- etc.
Usability
Millions of customers use GitLab, so UX improvements can have a huge collective impact across all of these individuals. We support this effort both in the product development as well as in our architecture. This includes continued conversion of Pajamas components in order to continue to improve the performance experienced by users.
Development team members should also constantly suggest and investigate how to improve the overall user experience of the product. These can range from enhancing performance (actual and perceived), suggesting new technologies, solving user experience issues efficiently, etc.
Efficiency
GitLab’s Development group ships thousands of product merge requests per month. Continuing to scale our development process to an ever larger number of contributors requires efficiency, collaboration and iteration. We focus on training our new hires on iteration and process improvements, saving team members time. We will also review the best metrics to focus on. Doing so will help us measure the efficiency of our responsiveness to our peers for the company and the community.
Diversity
We will follow our parent department Engineering lead.
Organizational Structure
@startwbs
* Core Development
** Create
*** Code Creation
*** Code Review
*** Remote Development
*** Editor Extensions
*** Source Code
** Manage & AI Framework
*** AI Framework
*** Foundations
*** Import
** Ops
*** Deploy
*** Observability
*** Package
*** Verify:Runner
*** Verify:Pipelines
**** Pipeline Authoring
**** Pipeline Execution
**** Pipeline Security
** Plan
*** Optimize
*** Product Planning
*** Project Management
*** Knowledge
** Analyze
*** Product Analytics
*** Analytics Instrumentation
@endwbs
Organizational Responsibilities
The core development team is comprised of:
Team Members
The following people are permanent members of the Development Department:
Development-Specific People Processes
Promotion Process
Aligned with the company-wide promotion cadence, Development utilizes a quarterly process to collect, validate, approve, review all promotion proposals prior to them being added via the company-wide process. The goal of this quarterly promotion projection and review is to:
- Promote the right people at the right time
- Maintain a high bar for promotions
- Ensure predictability and intentionality with promotions
- Ensure alignment with overall company promotion rate
- Add another layer of review to reduce bias in the promotion process
Development adheres to the company-wide quarterly timeline outlined here as our SSOT.
The Development Department has an additional formal step built in to our promotion process beyond what the company is currently adhering to through our peer review process. Ahead of the commencement of the Calibration stage of our process, all promotion documents should be peer reviewed by a Senior Manager or Director. The due date to complete the peer review is before the scheduled Calibration session.
FY'23 Calibration sessions:
- FY23-Q1: January 13, 2022
- FY23-Q2: April 7, 2022
- FY23-Q3: June 30, 2022
- FY23-Q4: October 5, 2022
Calibration session attendees are the following team members: Senior Managers, Directors, Sr. Directors, VP, and Development’s aligned People Business Partner. Leaders are welcome to conduct Calibration sessions prior to the scheduled sessions above with their sub-departments as well (though this is not a requirement).
In addition to the company-wide calibration preparation, for the Development department we also ask that leaders come prepared to discuss:
- Status of maintainership
- Most recent talent assessment
Calibration Agenda
In order for calibration to be effective it’s important that all participants have had an opportunity to review promotional documents and summaries ahead of the meeting.
The calibration agenda will consist of the following for each candidate:
-
General Information
- Promotion Doc Peer Reviewer(s)
- Link to GitLab Profile
-
Core accomplishments (list 2)
-
Improvement areas (list 2)
- The promotion document outlines strengths, but we also want to highlight how we will support a team member’s development areas at the next level.
-
Cross-functional Feedback
- As our business goals and initiatives become increasingly cross-functional, managers should have a picture of how their team member collaborates effectively within their immediate teams, and with their core cross-functional partners and stakeholders.
-
Questions/feedback?
Please aim to be concise and crisp in the calibration agenda summary for each candidate. Leaders are able to reference promotion documents for details, while the calibration agenda summary is meant to be a snapshot of key points to help facilitate discussion and provide an overview for the group.
To allow time for review and the addition of questions/feedback, summaries should be included in the agenda no less than one week prior to the Development Leadership scheduled calibration date.
In line with our guidance on feedback, feedback should be regular and ongoing. Calibration sessions are meant to discuss team member promotion readiness and calibrate promotions across the department, but they should not replace the regular and ongoing feedback provided throughout the year. Any relevant feedback should be given promptly and not wait until talent assessments or promotion calibration. This will ensure that both the team member and their manager have an opportunity to address feedback in a timely manner.
Talent Assessment Process
Talent Assessment Process guidelines specific for the Core Development Department is documented in this handbook page.
Annual Compensation Review
The SSOT timeline for the upcoming Annual Compensation Review can be found here. Below you will find additional dates specific to the Development department to ensure all levels have time to review as we move through the process.
Phase 1 (cash only):
- January 9-13 @5pm PT - Manager level finalizes comp recommendations
- January 16-17 @5pm PT - Sr Mgr (or next level; Director in some cases) finalize comp recommendations
- January 18-19 @5pm PT - VP, Development direct reports (Dir/Sr Dir) finalize comp recommendations
- January 20-23 @ 5pm PT - VP/PBP finalize comp recommendations
Phase 2 (equity only):
- February TBD
How we hire contractors
In this handbook page we document the process that the development department follows, including planning budget, candidate sourcing, interview process, contracting and onboarding.
How We Work
Onboarding
Welcome to GitLab! We are excited for you to join us. Here are some curated resources to get you started:
Cross-Functional Metrics
Overview
The Cross-Functional Prioritization framework exists to give everyone a voice within the product development quad (PM, Development, Quality, and UX). By doing this, we are able to achieve and maintain an optimal balance of new features, security fixes, availability work, performance improvements, bug fixes, technical debt, etc. while providing transparency into prioritization and work status to internal and external stakeholders so they can advocate for their work items. Through this framework, team members will be able to drive conversations about what’s best for their quad and ensure there is alignment within each milestone.
The Cross-Functional Prioritization contains three key tenets:
- Release slate is divided into three main components: features and usability, optimization and maintenance, and bugs including severity-based SLAs
- Cross-functional DRIs are responsible for prioritization in each section, anyone is still able to advocate for prioritization changes
- DRI decisions informed by qualitative and quantitative data, up to and including automatic scheduling of work items based on SLA policies
An aspirational goal for the R&D organization is achieving an end state where our aggregate R&D development capacity is allocated along a 60%/40% split as follows:
- 60%: focused on features and usability
- 40%: focused on optimization, general maintenance, security items, and bugs
We recognize that making progress towards our desired end state requires significant effort and cannot be achieved immediately. Success will require cross-functional discipline, diligence, and alignment in both planning and execution, with tangible progress towards our desired end state 60%/40% split being measurable release over release. We recognize that based upon the maturity of a given area, this ratio may need to be different per team. We see this represented in data today across the portfolio, where for example a team with relatively immature features may require more feature work allocated, while teams with more mature features carry a heavier maintenance burden. Each group has the ownership and accountability to define the correct ratio across all categories based on Category maturity as well as maintenance needed to continue meeting our security, scalability, reliability, availability, and quality requirements. Teams will align with R&D leadership across Product & Engineering to ensure R&D demonstrate continuous improvement towards our desired 60%/40% end state.
The table below summarizes the 60%/40% split by component:
Component | R&D Target % |
---|---|
Features and usability | 60% |
Optimization and maintenance —AND— Bugs including severity-based SLAs |
40% |
A balance across these components while empowering DRIs will allow GitLab to operate in a way that will allow us to meet (and exceed) revenue goals while maintaining the security, stability, reliability, and availability of our platform.
Cross-functional milestone planning
To support GitLab’s long-term product health and stability while keeping the pace of new features for users, teams are asked to plan their milestones with an appropriate ratio of work. When labeling, if the label selection for an issue or merge request isn’t obvious, work with your peers/manager or reach out to Staff TPM R&D Compliance for further clarification.
To assist with reporting and support SOX compliance, please review and leverage the labels per table below:
Component | Label |
---|---|
Features and usability | type::feature |
Optimization and maintenance | type::maintenance |
Bugs including severity-based SLAs | type::bug |
Note: These are the original labels from the working group. These were chosen so that teams would not have to relabel historically, and existing dashboards would not be broken.
If one of these labels clearly doesn’t apply for an issue, consider using the type::ignore
label. This will exclude the issue from automation and dashboards used to do cross-functional prioritization and metrics tracking for the product. It is highly important we have accurate data, so please only use this label if the issue clearly does not pertain directly to Engineering changes to the product itself. This label will typically apply to issues used for planning or to track a process. For example, you could use the type::ignore
label for a milestone planning issue where the issue’s purpose is organization and will not have MRs directly associated with it.
A team’s ratio might change over time and different teams may have different ratios. Factors that influence what ratio is appropriate for a given team include the product category maturity, the area of the product they are working in, and the evolving needs of GitLab the business. Teams should review labeling for accuracy and minimize the number of type::undefined
items. This allows us to review the plans at the group, section, and company level with team members to ensure we appropriately prioritize based on cross-functional perspectives.
For more details on these three work types, please see the section on work type classification. The development EM is the DRI to ensure that the merge requests are accurately labeled.
Prioritization and DRI by Component
Our backlog should be prioritized on an ongoing basis. Prioritization will be done via quad planning (collaboration between product, development, quality, UX) with PM as the DRI for the milestone plan. PMs, EMs, Quality, and UX will provide the following:
- Product Manager provides prioritized
type::feature
issues - Engineering Manager in development provides prioritized
type::maintenance
issues - Test Platform Managers provide prioritized
type::bug
issues using the bug prioritization dashboard
Note: UX-related work items would be prioritized in accordance with the appropriate sub-types. UX related bugs are included in the automated process (S1/2 and so on), UX-related maintenance items will be included in the EM’s prioritized list, Product (feature) UX items will have been included as part of our normal Product Development Flow.
The DRIs of these three core areas will work collaboratively to ensure the overall prioritization of the backlog is in alignment with section direction or any other necessary product and business needs. If a team is not assigned a Product Designer then there is no UX counterpart needed for prioritization purposes. PMs will prioritize the final plan for a given milestone.
Milestone planning and prioritization
Quads should follow the standard milestone planning process as described in our Product Development Flow. PMs will keep the overall prioritized backlog following the agreed-upon ratios and guidance from their EM, Quality and UX counterparts.
Review and monitoring team health
Stable counterparts across the quad should regularly review their overall team health across many measures, including their merge request ratio and make adjustments accordingly. For guidance, below are some questions to ask to inform that discussion.
Example questions to ask as stable counterparts review team health
Context:
- What groups/sections does this review cover?
- Is the dashboard accurate? Are the number of merge requests in the dashboard within 5% of the SSOT (the issues themselves)? If not, what needs to be done to correct?
Maintenance/quality:
- Are the % of undefined merge requests < 1% for the timeframe being analyzed? If not, what should be done to correct?
- How do error budgets look?
- Are past due bugs being prevented/prioritized as appropriate?
- Are usability issues being prioritized as appropriate?
- Are security issues being prioritized as appropriate?
- Are infrastructure backlog issues being prioritized as appropriate?
- Are maintenance priorities from the engineering development manager being prioritized as appropriate?
Features:
- How is the group addressing the product investment themes?
- How do revenue drivers impact plans for this group?
- How are customer requests being addressed for this group?
Trends:
- Evaluate the percentage ratios of completed work (feature / maintenance / bug) for the previous milestone/timeframe against the team’s planned ratio for that milestone.
- Is there predictability from milestone to milestone (number of issues or issue weight per release)?
- Compare the planned milestone with the previous months merge request trends for the team. Any trends to note?
- What overall trends does the group want to highlight?
- What flags do you want to raise? What won’t happen?
Cross-Functional Collaboration
Working across Stages
Issues that impact code in another team’s product stage should be approached collaboratively with the relevant Product, UX, and Engineering managers prior to work commencing, and reviewed by the engineers responsible for that stage.
We do this to ensure that the team responsible for that area of the code base is aware of the impact of any changes being made and can influence architecture, maintainability, and approach in a way that meets their stage’s roadmap.
Architectural Collaboration
At times when cross-functional, or cross-departmental architectural collaboration is needed, the GitLab Architecture Evolution Workflow should be followed.
Follow the Sun Coverage
When cross-functional collaboration is required across global regions and time zones, it is recommended to adopt the Follow the Sun Coverage approach to ensure seamless global collaboration.
Decisions requiring approvals
At GitLab we value freedom and responsibility over rigidity. However, there are some technical decisions that will require approval before moving forward. Those scenarios are outlined in our required approvals section.
Security Vulnerability Handling
- The development groups who introduce or consume the dependency of concern (e.g. gems, libs, base images, etc.) are responsible for resolving vulnerabilities detected against the dependency.
- For business selected vendors that provide base images (RHEL’s UBI8 for example), we need to wait for their patches, or need to log Deviation Request (DR) as viable resolutions. The VulnMapper, an automation developed by the Threat Management team, can create vendor dependency DRs to a large extent, but there are still cases that DR needs to be reported manually.
- The assigned development group can redirect issues if the initial assignment was inaccurate, following the processes for shared responsibility issues and/or Shared responsibility functionality.
Development Headcount planning
Development’s headcount planning follows the Engineering headcount planning and long term profitability targets. Development headcount is a percentage of overall engineering headcount. For FY20, the headcount size is 271 or ~58% of overall engineering headcount.
We follow normal span of control both for our managers and directors of 4 to 10. Our sub-departments and teams match as closely as we can to the Product Hierarchy to best map 1:1 to Product Managers.
Development Staff Meeting
While we try to work as much as possible async, the Development department leadership does meet synchronously on a cadence of weekly. This meeting coordinates initiatives, communicates relevant information, discusses more difficult decisions, and provides feedback on how we are progressing as an organization. As part of this meeting, we discuss our culture of reliability monthly. This was part of the agenda spawned from an initiative we took up in August of 2021. We want to make sure we keep the organization healthy when thinking about reliability in every part of our work.
Daily Duties for Engineering Directors
This section applies to those who report to the VP of Development
The following is a non exhaustive list of daily duties for engineering directors, while some items are only applicable at certain time, though.
- Review engineering metrics
- Development Department Performance Indicators
- Sub-department Performance Indicators
- Dev
- Enablement
- Fulfillment
- Growth
- Ops
- Secure
- Govern
- Review hiring dashboards
- Personal todo list
- Personal GitLab board(s) if any
- Working groups that the director drives or participates in
- Action items in agenda documents
- Issue boards
- Slack channel
- Infradev triage
- Follow up open questions and ensure appropriate handling of issues with regard to priority and severity
- Agenda document
- Infradev board
- Performance refinement
- Follow up open questions and ensure appropriate handling of issues with regard to priority and severity
- Agenda document
- Performance board
- Infrastructure Development Escalations
- Triage new issues, enhance Issue details and ensure appropriate handling based on priority and severity
- Sync discussions for infradev Issues are part of the GitLab SaaS Weekly Meeting
- Agenda document
- Infradev board
- Follow active Engineering Global Prioritization(s) that the director sponsors
- Standup/status update document
- Issue board
- Holiday Emergency Contact Rotations
- Review and approve security approvals for the GitLab project when required and informing the security engineering team when a security risk is accepted rather than being resolved prior to approval.
Developing and Tracking OKRs
In general, OKRs flow top-down and align to the company and upper level organization goals.
Managers and Directors
For managers and directors, please refer to a good walk-through example of OKR format for developing team OKRs. Consider stubbing out OKRs early in the last month of the current quarter, and get the OKRs in shape (e.g. fleshing out details and making them SMART) no later than the end of the current quarter.
It is recommended to assess progress weekly.
- Append the percentage score to the subject of Objective epics and Key Result issues.
- Set the Health status of epics and issues.
- In the case where weekly assessment is impractical, an assessment shall be made by the end of each month.
Staff Engineers, Distinguished Engineers, and Fellows
Below are tips for developing individual’s OKRs:
- Align OKRs to team goals. However, it’s unnecessary to derive from all organizational OKRs. Simply decide what makes sense to your personal situation.
- Follow the same timeline of managers and directors, i.e. stubbing out early and bring OKRs in shape by the end of the current quarter.
- Refer to the same walk-through example of OKR format.
- Make SMART OKRs - Specific, Measurable, Achievable, Relevant, Time-bound.
- Follow the same progress assessment instructions above.
Examples
Engineering Allocations and Tracking
Engineering Allocation require us to track goals with more diligence and thought. We need confidence that we’re making correct decisions and executing well to these initiatives. As such, you will see us reviewing these more closely than other initiatives. We will meet on a cadence to review these initiatives and request additional reporting to support the process. Possible requests for additional data:
- Demos
- GitLab Roadmaps
- GitLab Architecture Workflow
- Dogfooding of features we think may be useful
We will hold Engineering Allocation Checkpoints on a cadence. The recommended cadence is weekly.
Roadmaps for Engineering Allocations
We track Engineering Allocation roadmaps. To use this effectively, roadmaps must have correct dates for their epic and weights assigned to issues. If a team does not normally use weights, then assign each issue a weight of 1 (all issues are equal).
Team allocation measurement
Each team needs to demonstrate how their allocation is being used. This is done to verify we are not over/under investing for a given initiative. This can be done via assignment (people assigned to work) and/or issues assigned. We will track issues and MRs and see as a percentage how that compares to the overall teams work.
Ownership of Shared Services and Components
The GitLab application is built on top of many shared services and components, such as PostgreSQL database, Redis, Sidekiq, Prometheus and so on. These services are tightly woven into each feature’s rails code base. Very often, there is need to identify the DRI when demand arises, be it feature request, incident escalation, technical debt, or bug fixes. Below is a guide to help people quickly locate the best parties who may assist on the subject matter.
Ownership Models
There are a few available models to choose from so that the flexibility is maximized to streamline what works best for a specific shared service and component.
- Centralized with Specific Team
- A single group owns the backlog of a specific shared service including new feature requests, bug fixes, and technical debt. There may or may not be a counterpart Product Manager.
- The single group is a specific team, meaning there is an engineering manager and all domain owner individuals reside in this team. The DRI is the engineering manager.
- This single group is expected to collaborate closely and regularly in grooming and planning backlog.
- This model may require consensus from the Product Management counterpart.
- This model may fit a subject domain that experiences active development.
- Centralized with Virtual Team
- A single group owns the backlog of a specific shared service including new feature requests, bug fixes, and technical debt. There may or may not be a counterpart Product Manager.
- The single group is a virtual team, meaning it consists of engineers from various engineering teams, for example maintainers or subject matter experts. Typically there isn’t an engineering manager for this virtual team. The DRI is an appointed person in the group who may not necessarily be an engineering manager.
- This single group is expected to collaborate closely and regularly in grooming and planning backlog.
- This model may fit a subject domain that’s in maintenance mode.
- Collectives
- Collectives consist of individuals from existing teams who voluntarily rally around a shared interest or responsibility, but unlike Working Groups may exist in perpetuity. The shared interest could be a specific technology or system. Collective members feel a collective responsibility to weakly own, improve upon or otherwise steer the subject they govern.
- This is a weaker form of the Virtual Team but introduces more structure than a fully decentralized model. It can be appropriate when some form of ownership is desirable where the subject has cross-cutting impact and wide reach and cannot clearly be allocated to any specific team.
- Collectives do not have product or engineering managers, they are fully self-governed.
- Members of the Collective sync regularly and keep each other informed about the shared interest. Problem areas are identified and formalized in the Collective, but are not logged into a Collective backlog. Instead a DRI is assigned who should put the task forward to the team with the greatest need for the problem to be resolved. This is to ensure that work is distributed fairly and that there are no two backlogs that compete with each other for priorities.
- Collectives work best when they consist of a diverse set of individuals from different areas of product and engineering. They double as knowledge sharing hubs where information is exchanged from across teams in the Collective first, and then carried back by the individuals to their specific teams.
- Decentralized
- The team who implements specific functions or utilizes certain features of the shared services is responsible for their changes from local development environment to production deployment to continued maintenance post-deployment. There is not a development-wide single DRI who owns a portion or the entirety of a shared service.
- A specialty team may exist for specific subject domains, however their role is to enable scalability, availability, and performance by building a solid foundation and great tools for testing and troubleshooting for other engineering teams, while they are not responsible for gating every single change in the subject domain.
Shared Services and Components
The shared services and components below are extracted from the GitLab product documentation.
Service or Component | Sub-Component | Ownership Model | DRI (Centralized Only) | Ownership Group (Centralized Only) | Additional Notes |
---|---|---|---|---|---|
Alertmanager | Centralized with Specific Team | @twk3 | Distribution | Distribution team is responsible for packaging and upgrading versions. Functional issues can be directed to the vendor. | |
Certmanager | Centralized with Specific Team | @twk3 | Distribution | Distribution team is responsible for packaging and upgrading versions. Functional issues can be directed to the vendor. | |
Consul | |||||
Container Registry | Centralized with Specific Team | Package | |||
Email - Inbound | |||||
Email - Outbound | |||||
Elasticsearch | Centralized with Specific Team | @changzhengliu | Global Search | ||
GitLab K8S Agent | Centralized with Specific Team | @nicholasklick | Configure | ||
GitLab Pages | Centralized with Specific Team | @vshushlin | Knowledge | ||
GitLab Rails | Decentralized | DRI for each controller is determined by the feature category specified in the class. app/controllers and ee/app/controllers | |||
GitLab Shell | Centralized with Specific Team | @sean_carroll | Create:Source Code | Reference | |
HAproxy | Centralized with Specific Team | @amoter | Infrastructure | ||
Jaeger | Centralized with Specific Team | @dawsmith | Infrastructure:Observability | Observability team made the initial implementation/deployment. | |
LFS | Centralized with Specific Team | @sean_carroll | Create:Source Code | ||
Logrotate | Centralized with Specific Team | @plu8 | Distribution | Distribution team is responsible for packaging and upgrading versions. Functional issues can be directed to the vendor. | |
Mattermost | Centralized with Specific Team | @plu8 | Distribution | Distribution team is responsible for packaging and upgrading versions. Functional issues can be directed to the vendor. | |
MinIO | Decentralized | Some issues can be broken down into group-specific issues. Some issues may need more work identifying user or developer impact in order to find a DRI. | |||
NGINX | Centralized with Specific Team | @plu8 | Distribution | ||
Object Storage | Centralized with Specific Team | @lmcandrew | Scalability::Frameworks | ||
Patroni | General except Geo secondary clusters | Centralized with Specific Team | @plu8 | Distribution | |
Geo secondary standby clusters | Centralized with Specific Team | @luciezhao | Geo | ||
PgBouncer | Centralized with Specific Team | @plu8 | Distribution | ||
PostgreSQL | PostgreSQL Framework and Tooling | Centralized with Specific Team | @alexives | Database | Specific to the development portion of PostgreSQL, such as the fundamental architecture, testing utilities, and other productivity tooling |
GitLab Product Features | Decentralized | Examples like feature specific schema changes and/or performance tuning, etc. | |||
Prometheus | Decentralized | Each group maintains their own metrics. | |||
Puma | Centralized with Specific Team | @pjphillips | Cloud Connector | ||
Redis | Decentralized | DRI is similar to Sidekiq which is determined by the feature category specified in the class. app/workers and ee/app/workers | |||
Sentry | Decentralized | DRI is similar to GitLab Rails which is determined by the feature category specified in the class. app/controllers and ee/app/controllers | |||
Sidekiq | Decentralized | DRI for each worker is determined by the feature category specified in the class. app/workers and ee/app/workers | |||
Workhorse | Centralized with Specific Team | @sean_carroll | Create:Source Code |
Learning Resources
For a list of resources and information on our GitLab Learn channel for Development, consult this page.
Continuous Delivery, Infrastructure and Quality Collaboration
In late June 2019, we moved from a monthly release cadence to a more continuous delivery model. This has led to us changing from issues being concentrated during the deployment to a more constant flow. With the adoption of continuous delivery, there is an organizational mismatch in cadence between changes that are regularly introduced in the environment and the monthly development cadence.
To reduce this, infrastructure and quality will engage development via SaaS Infrastructure Weekly and Performance refinement which represent critical issues to be addressed in development from infrastructure and quality.
Refinement will happen on a weekly basis and involve a member of infrastructure, quality, product management, and development.
Global Prioritization
Execution of a Global prioritization can take many forms. This is worked with both Product and Engineering Leadership engaged. Either party can activate a proposal in this area. The options available and when to use them are the following:
- Rapid action - use when reassignment isn’t necessary, the epic can have several issues assigned to multiple teams
- Borrow - use when a temporary assignment to a team is required to help resolve an issue/epic
- Realignment - use when a permanent assignment to a team is required to resolve ongoing challenges
Email alias and roll-up
- Available email alias (a.k.a. Google group): Managers, Directors, VP’s teams: each alias includes everyone in the respective organization.
- Naming convention:
team@gitlab.com, examples below -
- Managers: configure-be@gitlab.com includes all the engineers reporting to the Configure backend engineering manager.
- Directors: ops-section@gitlab.com includes all the engineers and managers reporting to the director of engineering, Ops.
- VP of Development: development@gitlab.com includes all engineers, managers, and directors reporting to the VP of Development.
- Roll up:
Teams roll up by the org chart hierarchy -
- Engineering managers’ aliases are included in respective Sub-department aliases
- Sub-department aliases are included in Development alias
Working with Support
When Development collaborates with Support it provides invaluable insight into how customers are using the product and the challenges they run into. A few tips to make the process efficient:
- Get access to Zendesk so you view the question and communication from customers.
- Always write answers in a way that they can be “cut-and-pasted” and sent to a customer.
- Reference documentation in your responses and make updates to GitLab documentation when needed.
- Refer to existing issues and epics to reiterate our transparency value and to invite participation from the customer.
- If you are unclear about the support-development collaboration process or workflow then please refer to the handbook page how to use gitlab.com to request help from the GitLab development team
Incident Management
Team members in some job families contribute to incident management directly through an on-call schedule for Incident Managers. Team members should complete onboarding so they can be added to the schedule when needed. These frequently asked questions cover exemptions and changing shifts.
Development Escalation Process
Reducing the impact of far-reaching work
Because our teams are working in separate groups within a single application, there is a high potential for our changes to impact other groups or the application as a whole. We have to be cautious not to inadvertently impact overall system quality but also availability, reliability, performance, and security.
An example would be a change to user authentication or login, which might impact seemingly unrelated services, such as project management or viewing an issue.
Far-reaching work is work that has wide-ranging, diffuse implications, and includes changes to areas which will:
- be utilized by a high percentage of users
- impact entire services
- touch multiple areas of the application
- potentially have legal, security, or compliance consequences
- potentially impact revenue
If your group, product area, feature, or merge request fits within one of the descriptions above, you must seek to understand your impact and how to reduce it. When releasing far-reaching work, use a rollout plan. You might additionally need to consider creating a one-off process for those types of changes, such as:
- Creating a rollout plan procedure
- Consider how to reduce the risk in your rollout plan
- Document how to monitor the rollout while in progress
- Describe the metrics you will use to determine the success of the rollout
- Account for different states of data during rollout, such as cached data or data that was in a previously valid state
- Requiring feature flag usage (example)
- Changing a recommended process to a required process for this change, such as a domain expert review
- Requesting manual testing of the work before approval
Identified areas
Some areas have already been identified that meet the definition above, and may consider altered approaches in their work:
Area | Reason | Special workflows (if any) |
---|---|---|
Database migrations, tooling, complex queries, metrics | impact to entire application The database is a critical component where any severe degradation or outage leads to an S1 incident. |
Documentation |
Sidekiq changes (adding or removing workers, renaming queues, changing arguments, changing profile of work required) | impact to multiple services Sidekiq shards run groups of workers based on their profile of work, eg memory-bound. If a worker fails poorly, it has the potential to halt all work on that shard. |
Documentation |
Redis changes | impact to multiple services Redis instances are responsible for sets of data that are not grouped by feature category. If one set of data is misconfigured, that Redis instance may fail. |
|
Package product areas | high percentage of traffic share | |
Gitaly product areas | high percentage of traffic share | |
Create: Source Code product areas | high percentage of traffic share. Special attention should be paid to Protected Branches, CODEOWNERS, MR Approvals, Git LFS, Workhorse and the git over SSH / gitlab-sshd interfaces. Please contact the EM (@sean_carroll) or PM (@tlinz) if you are unsure. | |
Pipeline Execution product areas | high percentage of traffic share | Documentation |
Authentication and Authorization product areas | touch multiple areas of the application | Documentation |
Compliance product areas | potentially have legal, security, or compliance consequences | Code Review Documentation |
Workspace product areas | touch multiple areas of the application | Documentation |
Specific fulfillment product areas | potentially impact revenue | |
Runtime language updates | impacts to multiple services | Ruby Upgrade Guidelines |
Application framework updates | impacts to multiple services | Rails Upgrade Guidelines |
Navigation | impact to entire application | Proposing a change that impacts navigation |
AI-powered stakeholders
This section provides an overview of all teams invested in implementing and maintaining AI features. Our Duo initiative is a cross-category effort.
These are the stakeholders:
Team | Stake |
---|---|
Create:Remote Development | Owns the WebIDE (maintainers) |
Editor Extensions | Maintains the GitLab Workflow VS Code Extension (maintainers), Jetbrains, Neovim, Visual Studio extensions and the language server. Also contributes with UX improvements for Code Suggestions within GitLab Workflow. |
Enablement:Cloud Connector (@mkaeppler , @nmilojevic1 ) |
AI-Assissted for Self-Managed |
AI Framework | Abstraction Layer for GitLab Chat, Code Suggestions and other AI capabilities |
Duo Chat | GitLab Chat for VSCode and WebIDE |
Create:Code Creation | Code Suggestions |
AI Model Validation Group | Suggested Reviewer, Code Suggestions AI Gateway functionality, Evaluating and tuning ML Models |
Infrastructure | Code Suggestions AI Gateway scalability |
ClickHouse Datastore usage
ClickHouse usage by Monitor:Observability group
Customer Account Escalation coordination
If development is the DRI or actively participating in a Customer Account Escalation, consider the following:
- Be careful to not make commitments to customers without first talking to product management and development leaders to confirm the impact that commitment may have on other commitments.
- The customer will want to know when they can see the benefits of a change. They may not be familiar with GitLab practices for tracking and predicting due dates and milestones. Also, they may not be familiar with our workflows and associated labels nor the predictability of code review timelines, different timelines on releases to GitLab.com compared with releases for self-hosted customers and our use of feature flags.
* Customers often don't rely on asynchronous communication at the level that GitLab does. Educate the customer on our practices and adapt to find a combined asynchronous and synchronous communication method and cadence that works for everyone.
* Encourage customers to collaborate with us in epics, issues, and merge requests of interest. Keep in mind that they may not have access to ones that are confidential and/or may not be comfortable or able to collaborate with us in this public forum.
* Consider utilizing Google documents to collaborate with the customer as a backup for collaboration via epics, issues, and merge requests.
* Consider utilizing a shared Slack channel to collaborate, adding the customers to our slack via "one Slack channel access requests". [Example](https://gitlab.com/gitlab-com/team-member-epics/access-requests/-/issues/16192)
* In meetings, tell customers why we like to record them and ask if they are OK with doing so. Consider using [Chorus](/handbook/sales/field-operations/sales-operations/go-to-market/chorus/) for scheduling the recordings to address legal requirements for recording meetings with customers.
* In meetings, tell customers why we take notes before, during, and after the meeting, as it may not be natural for them to collaborate in this way.
* Make sure the appropriate priority label is applied to all issues being tracked by the customer.
* In the agenda for recurring meetings, track the items tracked by the customer in priority order at the top and review the status, next steps, customer DRI, and GitLab DRI for each. Discuss in the meeting periodically.
Remind GitLab team members in Slack to update the status of items they are the DRI for before recurring meetings.
* Post a link to the meeting notes and recording in a Slack channel for the customer escalation, so those who did not attend know that the notes and recording are available for review.
* When there is an action item for someone in a meeting (whether they are present or not), tag them in an issue or MR (or in Slack) so they will see it.
## Books
Note: books in this section [can be expensed](/handbook/finance/spending-company-money/).
Interested in reading this as part of a group? We occasionally self-organize [book](/handbook/leadership/book-clubs/)
clubs around these books and those listed on our [Leadership page](/handbook/leadership/#books).
1. [The Principles of Product Development Flow](https://www.amazon.com/Principles-Product-Development-Flow-Generation/dp/1935401009/)
1. [Software Engineering at Google](https://gitlab.com/gitlab-com/book-clubs/-/issues/10)
## FY24 Team Building "Fun" Budget
### Overview of the budget
As part of the [FY24 team building budget](/handbook/finance/expenses/#team-building-budget) available to each division, Engineering is allowing team members and teams to self-organize and propose team building events to use the budget.
Development teams may apply to use the budget for team building events.
The budget limit per team member in FY24 is $500 and a team member must be part of an approved application to submit expenses related to a team building event.
### Examples of how it may be used
The team building budget may be used for a variety of activities, including but not limited to:
- [In-person meetups](/handbook/leadership/in-person/) with teammates and other department team members. Note that the budget is limited and may not cover the full cost of travel and lodging.
- Expensing a meal for a virtual team event.
- Credits for team members to buy GitLab swag.
- Coordinating a social event with team members who are already attending a conference.
### What it is not intended for
- Conference registration and travel. These should be applied for separately using the Growth and Development benefit application process.
### Application Process
- Create an issue in your team's issue tracker or [the Team Member Socials issue tracker](https://gitlab.com/gitlab-com/gitlab-team-member-socials/-/issues) containing the following details:
- Event/Usage description
- Event date
- Quarter when expenses will bu submitted. This can be different from the quarter in which the event will take place.
- Number of team members attending
- Total amount requested in USD.
- Ask your stage or sub-department leader to add the issue details to the FY24 Fun Budget Application Google Spreadsheet and ping the VP Development for approval.
- Once approval is granted or denied, the stage/sub-department leader will update the spreadsheet with the status and inform the team members who applied.
## Common Links
* [Development department board](https://gitlab.com/gitlab-com/www-gitlab-com/-/boards/1008667?scope=all&utf8=%E2%9C%93&state=opened&label_name[]=Development%20Department)
* [Current OKR's](https://gitlab.com/gitlab-com/www-gitlab-com/-/boards/1008667?scope=all&utf8=✓&state=opened&label_name[]=Development%20Department&label_name[]=OKR)
* Slack channel [#development](https://gitlab.slack.com/messages/C02PF508L)
* [Manager Notes](/handbook/engineering/development/managers/)